Calculation method of forestland quota occupation during the 15th Five-Year Plan period—Taking Guizhou Province as an example

  • CHEN Xuan ,
  • LU Peng ,
  • TIAN Yingjia ,
  • YANG Ting ,
  • YUAN Hedi ,
  • WANG Hua ,
  • SUN Qian
Expand
  • 1 Guizhou Forestry Inventory and Planning Institute, Guiyang 550003, China
    2 General Station of Forestry Technology Extension Bureau of Guizhou Province, Guiyang 550001, China
    3 Wetland and Public Welfare Forest Protection Center of Guizhou Province, Guiyang 550001, China

Received date: 2025-07-22

  Revised date: 2025-12-10

  Online published: 2026-04-17

Abstract

To address the significant deviation between the forestland quota used as a planning indicator calculated by a single method and the actual demand,this study used data from Guizhou Province from 2016 to 2024 and was in line with the overall requirements for forestry and grassland resource allocation during the 15th Five-Year Plan period.Three categories of methods were used to estimate the forestland quota:the new construction land demand method,time-series methods (including the function model,moving average,exponential smoothing,and the gray model),and stepwise regression based on national economic parameters.A multi-model fusion calculation framework was constructed.The credibility of each calculation method was quantified through expert assessment,establishing a multi-dimensional weight allocation system that includes the Analytic Hierarchy Process(AHP),the Precedence Diagram Method (PDM),and the Equal Weighting Method (EWM).The results indicate that:1)There are significant discrepancies among the results calculated by individual methods,ranging from 29 300 to 45 000 hm2.The multi-model fusion result based on AHP,which is 38 300 hm2,passed a rigorous consistency test and can serve as the planning indicator for the forestland quota for occupied forestland in Guizhou Province during the 15th Five-Year Plan period.2)The multi-fmodel fusion approach effectively mitigates the limitations inherent in single-method analyses by integrating their strengths and minimizing individual errors,thereby enhancing the precision and practical utility of the estimation.The calculated forestland quota for occupation can serve as a scientific foundation for formulating the forestland protection and utilization plan in Guizhou Province.Furthermore,it would provide a reference for forestland quota accounting in similar ecological regions,such as the southwestern plateau and mountainous areas.

Cite this article

CHEN Xuan , LU Peng , TIAN Yingjia , YANG Ting , YUAN Hedi , WANG Hua , SUN Qian . Calculation method of forestland quota occupation during the 15th Five-Year Plan period—Taking Guizhou Province as an example[J]. Forest and Grassland Resources Research, 2025 , 0(6) : 121 -131 . DOI: 10.13466/j.cnki.lczyyj.2025.06.012

References

[1] 管远保, 李晖, 朱志正. 建设项目征占用林地需求量预测方法探讨:以湖南省为例[J]. 林业资源管理, 2007(6):51-54.
[2] 饶日光, 王晓青, 张琳. 对林地需求量预测方法的探讨:以陕西省为例[J]. 西北林学院学报, 2013, 28(5):249-253.
[3] 黄朝法. 建设项目拟使用林地规模预测方法简析[J]. 林业勘察设计, 2012(1):41-45.
[4] 周奇. 福建省“十四五”期间占用林地定额测算方法研究[J]. 林业勘察设计, 2022, 42(3):5-8.
[5] 智长贵, 徐济德, 钟华友. 灰色系统理论对我国“十一五”期间征占用林地数量预测分析[J]. 林业资源管理, 2008(2):75-77.
[6] 唐崇袍, 黄天来, 王建勇. 基于灰色理论的青田县林地征占用预测分析与保护管理建议[J]. 绿色科技, 2023, 25(17):131-136.
[7] 李建中, 毛旭鹏, 贺敏, 肖姗姗, 任琼. 江西省“十四五”建设项目林地需求量预测[J]. 中南林业调查规划, 2023, 42(1):11-16.
[8] 洪端芳, 叶光辉, 梁文慧, 等. 福建省林地征占用年度定额编制关键问题的研究[J]. 林业勘察设计, 2011(1):13-16.
[9] 谢国来, 陈振雄. “十三五”占用征收林地定额测算调整方案探讨[J]. 中南林业调查规划, 2016, 35(4):1-4.
[10] 贵州省林业局. 2024年贵州省林业年鉴[EB/OL].(2025-08-15)[2025-11-22]. https://lyj.guizhou.gov.cn/gzlq/gzlynj/202508/t20250815_88476617.html.
[11] 贵州省宏观经济数据库. 贵州省2016—2024年统计年鉴及国民经济和社会发展统计公报[DB/OL].(2025-03-22)[2025-07-22]. http://hgk.guizhou.gov.cn/publish/channels/c7/c7_1.html.
[12] 周宏文. 为高质量发展持续做好要素保障支撑[N]. 贵州日报,2025-11-19(2).
[13] 贵州省人民政府. 中共贵州省委关于制定贵州省国民经济和社会发展第十五个五年规划的建议[EB/OL].(2025-12-01)[2025-12-09]. https://www.guizhou.gov.cn/zwgk/zcfg/swygwj/202512/t20251201_89000657.html.
[14] LI Bin, BAI Xingping, GAO Huanhuan, et al. Outlier detection of slope deformation monitoring data based on WMA-3σ[C]. Proceedings of the 2023 5th International Conference on Hydraulic,Civil and Construction Engineering(HCCE 2023),Atlantis Highlights in Engineering, 2024, 26:189-199.
[15] 朱登远, 常晓凤. 灰色预测GM(1,1)模型的Matlab实现[J]. 河南城建学院学报, 2013, 22(3):40-46.
[16] 胡永梅. 灰色系统GM(1,1)模型在煤矿瓦斯涌出量预测中的应用[J]. 能源与环境, 2008(4):45-46.
[17] TAVANA M, SOLTANIFAR M, SANTOS A. Analytical hierarchy process:Revolution and evolution[J]. Annals of Operations Research, 2021, 326:879-907.
[18] 焦阳, 李刚, 李建平, 等. 考虑专家有效信息的群决策赋权方法研究[J]. 中国管理科学, 2024, 32(8):107-116.
[19] 贵州省林业局. 贵州省“十三五”林业发展规划[EB/OL].(2017-02-15)[2025-07-22]. https://lyj.guizhou.gov.cn/zfxxgk/fdzdgknr/ghjh_5620837/202101/t20210129_66610419.html.
[20] 贵州省林业局. 贵州省“十四五”林业草原保护发展规划[EB/OL].(2021-10-19)[2025-07-22]. https://lyj.guizhou.gov.cn/zfxxgk/fdzdgknr/ghjh_5620837/202111/t20211122_71760476.html.
Outlines

/